Workstations for Control Centres Australia in a remarkably short timeframe by AME System
The AME System detailing and fabrication phases have yielded outstanding results, garnering favourable feedback from every stakeholder and user involved in the project. From the outset, AME System was presented with specific design criteria and tight time commitments as prerequisites for awarding the contract. Remarkably, AME System approached these conditions with utmost professionalism, delivering without a hitch or complaint throughout the entire process.
One particularly noteworthy aspect was the collaboration between AME System and the building works fit-out contractor, who operated independently of AME's head contractor. Despite the challenges posed by a tight site and strict timelines, AME's team impressed everyone with their efficiency and cooperation. AME System strategically managed material deliveries to minimise congestion and maintain safety on the crowded site, earning praise from the fit-out contractor.
Throughout the project, AME System demonstrated a remarkable ability to work harmoniously amidst a flurry of activities and overhead works. AME's cooperative and professional demeanour ensured minimal disruption to other site operations, with the fit-out contractor reporting no distractions caused by AME's activities.
Despite the demanding circumstances, AME System completed work in a remarkably short timeframe, finishing in just 2½ days despite being allotted 5 days. This efficient turnaround not only underscored AME's commitment to meeting deadlines but also highlighted proficiency in executing tasks with precision and speed.
AME System performance in this project exemplifies dedication to excellence, professionalism, and collaboration, ability to navigate challenging conditions while delivering exceptional results speaks volumes about AME's capabilities and reliability as a trusted partner in fabrication and detailing projects.
Control Centres Australia Testimonial
The AME shop detailing and fabrication phases produced an excellent product which every stakeholder and user has commented upon favorably.
We presented AME with quite specific design criteria and time commitments as conditions precedent to their contract award. AME took them all on professionally and we were never to experience a problem or complaint.
Very importantly, on the tight site and in the tight timeline, the work site was shared with the building works fit out contractor (who was not AME’s head contractor) and they were well impressed with how AME personnel did their work, especially their cooperation in staggering the amount of material they brought up to the site at a time so as to reduce congestion and to maintain safety in the crowded site.
AME worked cooperatively, professionally and efficiently amongst all the other activity and overhead works going on.
The fit out contractor reported they were not distracted by AME’s activities as they fitted in professionally with all the other activity on site.
Russell Ockendon
CEO - Control Centre Australia